Milwaukee’s New M18™ Bluetooth Jobsite Radio + Charger

November 20, 2025

Milwaukee Tool introduces their new M18™ Bluetooth® Jobsite Radio + Charger, engineered for optimized sound quality, enhanced connectivity, and unmatched jobsite versatility.  Equipped with two 4.48” woofers and two 1.21” high-frequency tweeters, this radio provides powerful, dynamic sound for large or outdoor spaces. With Bluetooth® 5.3, this radio provides up to 200 ft of connection range, along with AUDIO-LINK technology that wirelessly connects over 200 compatible radios or speakers.

To customize the sound audio experience, users can adjust the equalizer settings to their preference. The radio also features built-in M18™ battery charging and USB-C charging for personal devices. Built for the jobsite, this radio is compatible with the PACKOUT™ Modular Storage System, and is designed to withstand harsh conditions with impact, dust, and water resistance, with an IP65 rating. 

Milwaukee’s New M18™ Bluetooth Jobsite Radio + Charger
Features:
  • M18™ Bluetooth Jobsite Radio + Charger
  • AUDIO-LINK allows you to connect to multiple compatible Milwaukee® devices (200+)Up To 8 hours of Runtime on a M18™ REDLITHIUM™ XC5.0 Battery At 100% Volume   Charges
  •  All M18™ Batteries AM/FM Radio: 9-Station Presets
  • USB-C 3.0A Personal Device Charging Up To 200 Feet of Wireless Connection Range 1-year limited warranty
Product NameSKUAvailability
M18™ Bluetooth® Jobsite Speaker2956-20December 2025

More Information

Related Articles


Latest Articles

  • Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    For many contractor-owned businesses, growth starts to feel harder than it should. The work is there. Customers are steady. Crews are busy. Yet when owners look to expand, invest, or create breathing room, capital often feels tighter than expected. In many cases, the issue is not operations or demand. It is a real estate decision made years… Read More…

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in Read More…


Changing Scene