Nesco Firestop-814 Intumescent Firestopping Sealant

November 10, 2025

NESCO introduces Firestop-814, a cULus-listed intumescent firestopping sealant engineered to restore fire-rated integrity for up to 4 hours when floors and walls are penetrated by mechanical, electrical, or plumbing systems. Firestop-814 meets ASTM-E814, ASTM-E1966, and other critical standards and is chemically compatible with PVC, CPVC, ABS, PEX, and most pipe types.

Key specifications:
  • Chemistry: Acrylic, water-based
  • Application temperature: 4°C to 49°C (40°F to 120°F)
  • Color: Red for easy inspection
  • Tooling time: ~30 minutes; full cure in 3-4 weeks
  • VOC content: ≤10g/L; LEED v4 tested
  • Shelf life: Approximately 2 years
  • Up to 4-hour fire-rating (ASTM-E814 compliant)
  • Paintable after cure
  • Available in 10.1 fl. oz. tubes

Firestop-814 is non-sag, freeze-thaw compatible, and suited for dynamic installations in commercial and multifamily construction. Contact your NESCO distributor for samples and pricing.​

Nesco Canada

Related Articles


Latest Articles

  • Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    For many contractor-owned businesses, growth starts to feel harder than it should. The work is there. Customers are steady. Crews are busy. Yet when owners look to expand, invest, or create breathing room, capital often feels tighter than expected. In many cases, the issue is not operations or demand. It is a real estate decision made years… Read More…

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in Read More…


Changing Scene