Greenlee Next-Gen Battery Powered Hydraulic Tools

November 14, 2016

Greenlee Textron Inc. new line of Next Generation battery-powered hydraulic tools include real-time communication technology and improved ergonomics, focus on optimizing the tool’s centre of gravity for the comfort of the worker, and provide a longer battery life supplied by an enhanced Makita platform.

“A lot has changed since Greenlee introduced the first battery-powered hydraulic cutters and crimpers back in 1995,” says Ryan Berg, Director of Product Management for Greenlee. “Today’s professional electricians want tools that have the latest in technological advances, such as a full diagnostic readout that prove the job was done correctly, a more ergonomic design and, of course, more power. Our new battery-powered hydraulic tools are packed with all of these features and many more.”

Tools in the new Next Generation line include 6-, 12-, and 15-ton crimping tools, as well as cable and bolt cutters, and a 10K PSI pump with removable heads that have the capabilities to do both.

Each product in this new line of tools features Bluetooth communication technology. This allows electricians to wirelessly manage their tools, access tool history, monitor service timelines, and customize tool operation to suit their preferences.

Each crimper is equipped with Intelli-CRIMP technology, a unique pressure sensor that monitors the crimping process, ensuring the correct amount of pressure is applied to each crimp. Crimpers equipped with this feature emit audible and visual alerts to notify the operator when a crimp is below specifications, giving assurance to the operator that the job was done right.

Some tools are also equipped with Auto Retraction Stop (ARS), which retracts the ram just enough to prepare the tool for the next cycle, saving time and energy. Retraction Stop Repeat (RSR) allows the operator to partially retract the ram and repeat that retraction for subsequent crimps.

The improved ergonomics of the Next Generation tools includes a reverse tapered hand grip for increased grip strength, and optimal hand positioning to help avoid user fatigue. The rugged housing construction protects internal components against dirt and water intrusion. There is also a larger hydraulic reservoir for increased oil capacity and application for in-line products. The enhanced tool design also features an LED display that exhibits real-time communication of tool details including: battery charge level, pressure sensor readings, and cycle information.

The new Next Generation tools also come with an upgraded high capacity Makita battery platform that includes an active battery monitoring system for longer lasting productivity. The upgraded power capacity also provides more battery supply, protection, and a fuel gauge to inform the user of the battery’s remaining amount of charge.

The new Greenlee Next Generation battery-powered hydraulic cutter and crimpers offer a high-quality solution for faster, safer and easier wire and cable termination. For more information, visit www.greenlee.com or call 1-800-435-0786.

 

Related Articles


Latest Articles

  • ESA Provides an Update on its New Self-Serve Licensing Platform

    ESA Provides an Update on its New Self-Serve Licensing Platform

    March 27, 2026 In October 2025 Electrical Safety Authority (ESA) officially launched its new self-serve licensing platform, a modern system designed to transform how Master Electricians (MEs) and Licensed Electrical Contractors (LECs) manage their licensing needs. The platform replaces paper-based processes and provides a centralized, web-based experience for renewing and applying for licences, paying fees Read More…

  • BC Updates to Solar and Battery Rebate Program Come into Effect April/June 2026

    BC Updates to Solar and Battery Rebate Program Come into Effect April/June 2026

    March 27, 2026 Starting April 1, 2026, our battery rebate offer is changing. The offer will include: Applications submitted before April 1, 2026, will be reviewed under the current rebate amounts. New requirement for working with contractors Beginning June 1, 2026, solar and battery installations must be completed by a Home Performance Contractor Network (HPCN) member to Read More…

  • CSA Report: Online Sales of Unapproved Consumer Electrical Products in Canada

    CSA Report: Online Sales of Unapproved Consumer Electrical Products in Canada

    March 27, 2026 Canadian electrical regulators have identified that the online sales of unapproved consumer electrical products are of a serious concern, and with the growing number of online marketplaces globally there is likely a higher volume of unapproved, or non-compliant, consumer electrical products available for purchase to Canadian consumers. In 2025, Canadian Standards Association Read More…

  • Tackling Unsafe Electrical Products Sold Online: Key Outcomes from the National Workshop Agreement 

    Tackling Unsafe Electrical Products Sold Online: Key Outcomes from the National Workshop Agreement 

    March 27, 2026 By Electro-Federation Canada The rapid growth of e-commerce has transformed how Canadians purchase electrical products, but it has also introduced new safety risks. EFC members have been raising concerns for several years about the increasing availability of unsafe and unapproved electrical products sold online, often without clear evidence of certification or compliance with Canadian requirements. To Read More…


Changing Scene

  • Skills Ontario Supports Critical Skilled Trades Investment in the 2026 Ontario Budget

    Skills Ontario Supports Critical Skilled Trades Investment in the 2026 Ontario Budget

    March 27, 2026 — Skills Ontario welcomes the 2026 Ontario Budget: A Plan to Protect Ontario, released today by the Ontario Government and Minister of Finance Peter Bethlenfalvy, and applauds the continued commitment to investing in skilled trades, technologies, and workforce development. Skills Ontario was pleased to see the government maintain and strengthen its support Read More…

  • Toronto Hydro Launches New Pilot Program to Help Multiplex Builders Energize

    Toronto Hydro Launches New Pilot Program to Help Multiplex Builders Energize

    April 27, 2026 Toronto Hydro is launching a trailblazing customer pilot project designed to help local builders electrify multiplex housing without complex service upgrades. Through Toronto Hydro’s Multiplex PowerPlay, up to six multiplex projects can qualify to receive funding toward a smart energy load management system. Smart load management systems continuously monitor total building energy Read More…

  • Gescan and George Gordon Developments Strengthen Community Impact in Saskatchewan

    Gescan and George Gordon Developments Strengthen Community Impact in Saskatchewan

    March 25, 2026 Gescan, a Sonepar Company, is proud to highlight its continued commitment to supporting communities across Saskatchewan through their meaningful alliance with George Gordon Developments Ltd. (GGDL). With a strong focus on community development, workforce participation and inclusive growth, Gescan is working closely with GGDL to create training, employment and business opportunities for Saskatchewan residents. These efforts are particularly focused on supporting individuals Read More…

  • Electric Avenue Launches Incentive Program for EV Charging Installers

    Electric Avenue Launches Incentive Program for EV Charging Installers

    March 23, 2026 Halifax-based EV charging solutions provider Electric Avenue has announced the official launch of its new Contractor Incentive Program, a first-of-its-kind initiative in the EV charging industry, built exclusively for contractors who have completed the company’s Installer Certification course. The program rewards certified installers for every verified and networked installation they complete, offering cash Read More…