Panduit Hinged Cover Wide Slot Wiring Duct

February 24, 2025

The H2X4LG6 PVC Hinged-Cover Wide Slot Wiring Duct features a hinged cover and wide finger/slot design that provides greater rigidity and allows for use with a range of wire/bundle sizes. Upper and lower scorelines allow for easy finger/sidewall section removal. UL 94 flame class of V-0 with UL recognized continuous-use temperature up to 122°F (50°C). Mounting holes provided. Lead-Free PVC. 4″ x 2.17″ (101.6mm x 55.1mm) and 6′ (1.83m) long.

Duct and Hinge cover sold separately.

Features

Product TypeBase Wiring Duct
ApplicationHinged Cover Wide Slot Wiring Duct provides wire management in general purpose applications where it is beneficial to retain cover during wire changes
ColorLight Gray
Cover Part NumberHC2LG6
Flammability RatingUL94V-0
IncludesBase Only
Standards MetUL 94 V-0 Recognized; CSA Certified; CE Compliant; RoHS Compliant
MaterialPVC
Material PropertiesLead-Free
Mount MethodMounting Holes
Measurement SystemImperial
Wiring Duct StyleHinged Cover Wide Slot Wiring Duct
Wiring Duct TypeH
Overall Length (ft.)6
Overall Length (m)1828.8
Overall Width (In.)2.17
Overall Width (mm)55.1
Overall Height (In.)4.1
Overall Height (mm)104.1
Slot Width (In.)0.31
Slot Width (mm)7.9

Go HERE for more information on Panduit Hinged Cover Wiring Duct

Related Articles


Latest Articles

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed… Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will… Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in… Read More…

  • Residential Investment in Building Construction Declines in September

    Residential Investment in Building Construction Declines in September

    December 15, 2025 Overall, investment in building construction decreased 1.1% to $22.4 billion in September. Investment in the residential sector declined 1.7%, while that in the non-residential sector was virtually unchanged. Year over year, investment in building construction grew 6.0% in September. On a constant dollar basis (2023=100), the total value of investment in building construction in September decreased 1.4%… Read More…


Changing Scene