Greenlee 6 Ton In-line Remote Crimper/Cutter with Interchangable Heads for a Variety of Applications

May 26, 2023

  • Hot stick adaptor (BTC3-TJ) utilizes standard universal spline interface
  • Universal remote control (BTC3GL) can be used with any Greenlee remote crimper/cutter
  • Interchangeable heads for a variety of crimping and cutting applications
  • Intelligent Crimping System Technology includes a pressure sensor that monitors the crimping force of each crimp and provides the operator a visual and audible alert if the force is below specifications
  • Cutting head rotates 350 degreesUses bio-degradable oil

Crimper/Cutter Specifications

Sub BrandGator
TypeRemote Scissor Cutter
StandardIEC-62841-1
Cutting EdgeSoft Metal
Cutting Range600 kcmil Copper/ Aluminum
Jaw Size1.26 (32 mm)
Overall Length17.75 (451 mm)
Handle TypeIn-Line with Over Molded Grip
Jaw MaterialHardened Steel
Finish Black Oxide

Source

Related Product

Greenlee Introduces New 881GX Hydraulic Bender

Greenlee, a part of Emerson’s professional tools portfolio, added industry-first features to its popular large diameter conduit bender with the launch of the 881GX Hydraulic Bender. The bender is engineered with a lighter-weight profile and innovative accessories to lessen user strain and increase productivity on the job, helping the skilled trades complete bending jobs more efficiently and safely.

Related Articles


Latest Articles

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed… Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will… Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in… Read More…

  • Residential Investment in Building Construction Declines in September

    Residential Investment in Building Construction Declines in September

    December 15, 2025 Overall, investment in building construction decreased 1.1% to $22.4 billion in September. Investment in the residential sector declined 1.7%, while that in the non-residential sector was virtually unchanged. Year over year, investment in building construction grew 6.0% in September. On a constant dollar basis (2023=100), the total value of investment in building construction in September decreased 1.4%… Read More…


Changing Scene